We have particular expertise in the design of ‘High Risk Buildings’ including many of the tallest residential towers in the London skyline.
We are accredited through the Association of Noise Consultants (ANC) to carry out Pre-completion Sound Testing to demonstrate compliance with Part E.
Having completed several thousand of these tests, we have extensive data on the in-situ performance of most types of building constructions. This enables us to be confident in our designs without needing to ‘over-engineer’ constructions, often saving clients substantial sums while supporting compliance with both Part E and the Building Safety Act.
Client: G&H
Contractor: JJ Rhatigan
Architects: 3Dreid
Cass Allen were appointed to provide detailed acoustic design services on the Guildford Station Redevelopment project. This included a block of high-quality residential accommodation above commercial areas adjacent to the Guildford Station and associated railway.
We provided the necessary input to ensure compliance with acoustics-related Employer’s Requirements, planning conditions and Building Regulations, including full acoustic design and testing. Our scope also supported the successful Gateway 2 submission under the Building Safety Act, contributing to regulatory approval for this complex, high-risk residential development.
Client: London Square
Architect: 5Pa
The Biscuit Factory redevelopment transforms a former industrial site into a mixed-use development centred on a new public plaza, comprising four courtyard blocks, a nine-storey tower, a public park, five new streets, and five retained buildings beside Bermondsey’s railway viaducts.
We are providing comprehensive acoustic consultancy for the detailed design of London Square’s portion of the development including mitigation of vibration from the adjacent railway. The development is a key success story for Cass Allen and London Square regarding the Building Safety Act Gateway 2 process, being one of the earliest projects achieving full GW2 approval for London Square’s portion of the development.
Client: London Square
Architect: ACA Studios
Cass Allen worked closely with the developers London Square and the architects ACA Studios to provide the full acoustics detailed design of the Westminster tower development through RIBA Stages 3 and 4, with works currently in RIBA Stage 5. The development is comprised of thirty residential units and a first floor working space totalling 17 floors in the heart of London.
With the height of the building pushing the tower into the ‘Higher Risk Building’ category, this triggered the inclusion of the development in the Gateway 2 process. For Cass Allen this involved a thorough evaluation and assessment of the detailed design against the Part E requirements and acoustic related elements of Part O.
Read MoreCass Allen worked closely with the developers London Square and the architects ACA Studios to provide the full acoustics detailed design of the Westminster tower development through RIBA Stages 3 and 4, with works currently in RIBA Stage 5. The development is comprised of thirty residential units and a first floor working space totalling 17 floors in the heart of London.
With the height of the building pushing the tower into the ‘Higher Risk Building’ category, this triggered the inclusion of the development in the Gateway 2 process. For Cass Allen this involved a thorough evaluation and assessment of the detailed design against the Part E requirements and acoustic related elements of Part O. The Part E compliance chapter was broken down into the component E1 to E3 requirements providing robust assessment of the separating walls and floors of the development between the penthouses, apartments, and communal areas of the development, internal partitions within apartments, junctions details, penetrations, and reverberation treatment for common corridors.
Client: St Edward, Berkeley Group
Cass Allen are providing the detailed acoustic design for this landmark regeneration of Guildford’s town centre, building on our longstanding relationship with St Edward and the wider Berkeley Group.
The development includes a mix of traditional concrete and modern steel framing construction methods, and our work enables the delivery of almost 500 new homes with supporting amenities while integrating alongside existing businesses, nightlife, and a new bus station.
Read MoreClient: St Edward, Berkeley Group
Cass Allen are providing the detailed acoustic design for this landmark regeneration of Guildford’s town centre, building on our longstanding relationship with St Edward and the wider Berkeley Group.
The development includes a mix of traditional concrete and modern steel framing construction methods, and our work enables the delivery of almost 500 new homes with supporting amenities while integrating alongside existing businesses, nightlife, and a new bus station.
This project also reflects our leading position in supporting our clients through the Gateway 2 submission process for the Building Safety Act, where the first phases now have full approval. Cass Allen uses experience of over thirty ongoing applications plus nearly 15 full approvals to maximise our clients’ chances of a successful, efficient process.
Client: St George, Berkeley Group
The Langley is a regeneration of a former retail site, providing around 1000 homes and supporting amenity facilities. Working closely with St George and Sheppard Robson Architects to develop the Gateway 2 submissions for acoustic design in Part E, F and O of the Building Regulations, we were able to overcome considerable scrutiny from the Regulator.
This enabled significant cost efficiency and design flexibility for the Berkeley Group and we have used this learning as a template for our many other successful and ongoing applications.
The £5 billion Universal Studios resort planned for Bedfordshire will create far more than a world-class visitor attraction, according to acoustic consultancy Cass Allen.
Read MoreCass Allen Supports Major Milestone at Coronation Square with Complex Acoustic Design.
Read MoreCass Allen delivered an Air Quality Assessment to support a landmark mixed-use development in Central Square, Cardiff.
Read MoreWe are delighted to welcome back Ronny to the team as a Senior Acoustics Consultant.
Read MoreWe are pleased to welcome three new team members – Finlay, Samuele, and Benedict – who each bring strong scientific and environmental expertise to the company.
Read More